Agency: City of Cathedral City
Location: Cathedral City, CA
Project Size: $16M
Completed: 2019
The project included improvements within the Date Palm Right-of-Way, between Varner Road to the north and I-10 to the south, a segment of approximately 0.68 miles. The road improvements resulted in six 12-foot travel lanes (three in each direction) and two 5-foot marked Class II bicycle lanes (one on each side of the road) separated by a 12-foot median.